Specialist Concrete Contractors in Soldotna, Alaska & the Kenai Peninsula

Tri City's Construction Inc.

Tri City's Construction Inc.Tri City's Construction Inc.Tri City's Construction Inc.
Home
Services
Contact US
Testimonials

Tri City's Construction Inc.

Tri City's Construction Inc.Tri City's Construction Inc.Tri City's Construction Inc.
Home
Services
Contact US
Testimonials
More
  • Home
  • Services
  • Contact US
  • Testimonials
  • Home
  • Services
  • Contact US
  • Testimonials

Services

Concrete Construction

Residential & Commercial Concrete Construction​

Call for Estimates  262-7594

Decorative Concrete

Levelrock Brand Floor Underlayment


Concrete Pumping

Regular Concrete Pumping for the Kenai Peninsula - Prices include pump and operator only. These prices do not apply to government funded/ prevailing wage projects. Prices are subject to change without notice.

60 ft. Boom Pump (16 meter)

Pump capacity: 60 yards per hour

  • $200.00 per hour (2 1/2 hr. minimum) 
  • plus $4.00 per yard pumped

90-108 ft. Boom Pump (28 & 33 meter)

Pump capacity: 160 yards per hour

  • $200.00 per hour (2 1/2 hr. - $500 minimum) 
  • plus $4.00 per yard pumped

Line Pump

Pump capacity: 40 yards per hour2, 3 and 4” line200’ of hose available (you will need a minimum of two people to handle hose)

  • $200.00 per hour (2 1/2 hr. minimum) 
  • plus $4.00 per yard pumped

Grout Pump

Pump capacity: 15-18 yards per hour2” Line 3/8” aggregate250’ of hose available (you will need a minimum of two people to handle hose)

  • $185.00 per hour (2 1/2 hr. - $462.50minimum) 
  • No yardage fee

Additional Charges

Travel charge one-way $4.00 per mile past the Kasilof River Bridge, Moose River Bridge, Funny River Bridge, and North Miller Loop. 


$240 flat rate travel charge to Swanson River Oilfields. 


Overtime Charge $45.00 per hour over eight hours total/Saturday/and after 5pm weekdays.  


Extra labor charges may apply for line pumping jobs – please discuss this with us beforehand. 


Winter Charge $75.00 flat (per day) 

We are not responsible for poor driveway or site soil conditions. If our equipment gets stuck you will be charged for cost of extrication and any damage caused.

Payment Terms

Payment due in full at time of service unless prior arrangements have been made.

We charge from the time we arrive on the job to set up thru the time it takes to clean out the pump – no exceptions. 


Cash or Check Payments.  Credit Cards are accepted only for Concrete Pumping.  

Call for a Free Quote

Copyright © 2020 Tri City's Construction Inc. - All Rights Reserved. 

  • Services

Powered by GoDaddy Website Builder